by Chris Okula | Jun 25, 2024 | Uncategorized
In response to a refining customer’s urgent need to minimize downtime during an outage of their Clark 3M centrifugal compressor, RMS embarked on a pioneering project leveraging digital technologies. This case study delves into how RMS, through its innovative...
by Chris Okula | Jun 18, 2024 | Uncategorized
Seamless Integration of Rotating Equipment Replacements The seamless integration of rotating equipment replacements is a critical undertaking in the engineering field. A recent project centered on the drop-in replacement of the AC Compressor D54 Centrifugal Compressor...
by Chris Okula | Jan 11, 2024 | Overhauls and Turnarounds
RMS worked with a world-class plastics manufacturer to support the upgrade and overhaul of their DH Single-Stage AC Compressor Centrifugal Compressor. This AC Compressor DH compressor was critical to the customer’s manufacturing process so RMS needed to execute at a...
by Chris Okula | Jan 4, 2024 | Overhauls and Turnarounds
RMS was contacted by a refining customer to support the overhaul of an AC Compressor V-405 centrifugal compressor. RMS conducted the entire overhaul operation at the RMS Pearland Works facility where the team worked to deliver this overhaul ahead of schedule. In...
by Chris Okula | Dec 18, 2023 | Overhauls and Turnarounds, Recent Projects
RMS was contacted to support a customer with an emergency outage of their Elliott 38M centrifugal compressor. This refining customer experienced a failure that caused water to enter the casing during operation leading to an emergency shutdown. RMS field service was on...